Drilling fluids ZJ70 solids control system & Drilling Rig ZJ20 Mud circulation System

*drilling rig ZJ70 mud circulation system *A Drilling Rig ZJ20 Mud circulation System and Equipments For our.Indian customer has just finished production.It takes about Ten Days Producing and Careful Test.
By: GN solids control
 
March 20, 2010 - PRLog -- In last CIPPE, there are so many potential importers on oilfield solids control system also quantities of suppliers. Both manufacturers and importers held good wish for bright cooperation. We GN Solids Control Equipments have obvious superiority for our excellent quality and economical cost.

http://www.gnsolidscontrol.com/drilling-fluids/zj70-solids-control-system-india

It is a complete Solids control system

Fluids Processing System
Shale Shaker
Mud Cleaner
Desander
Desilter
Decanting Centrifuge
Vacuum Degasser
Gas Liquid Separator
Mud Agitator
Sand Pump
Jet Mud Mixer
Shear Pump
Submersible slurry pump
Electric Ignition Device
Mud Gun

http://oilfield.gnsolidscontrol.com/zj-drilling-rig-mud-systemequipments/

During the exhibition many potential buyers came to visit us declared their cooperation tendency. Such as India was interested in our solids control system, after our mutual long term negotiation on technique details, special conditions of their drilling environment, etc.We reached an agreement then we began designing and manufacturing the whole system for them. Our engineer calculated time and time to prove the system is best for their special drilling situation, and workers do their best to satisfy customer’s requirements on style, dimension, outlooking, etc.

Through all staff’s cooperative efforts, about one month, we finished the required article timely also qualified. Before loading the goods our client came to inspect the product and they felt rather satisfied for our good efficiency and excellent quality. They appreciated our conscientious efforts and attentive service, they wish we can cooperate in long term.

Through this deal we get more experience in manufacturing certain goods in different situation, we know there is still a long way to go, to fulfill ourselves, to cater for various of customers’ demand. We believe we can do better and better for we always keep moving, we focus on clients.

 A Drilling Rig ZJ20 Mud circulation System and Equipments For our.Indian customer has just finished production.It takes about Ten Days Producing and Careful Test.

Some Pictures of the Drilling Rig ZJ20 Mud circulation System and Equipments

http://www.gnsolidscontrol.com/drilling-fluids/rig-zj20-m...

As we promised  our customer,As an ISO 9001:2000 manufacturer,first we use ERP management concept to make our production well organized. Then GN solids control QC team test every component strictly.After the whole mud system is finished. We run it to check every detail until it operates very well.

This Mud Tank Circulation System Including the following Main Equipments:

1,Two Linear Motion Shale Shakers
2,One Drilling Mud Cleaner
3,One Decanting Centrifuge
4,Four mud tanks
5,And other oilfield equipments parts for the system.

Now we are busy manufacturing another two mud circulation tank ststems and equipments for our Kazakhstan customer.

# # #

GN-Solids control is a China solids control equipments professional manufacturer.Our solids control equipments can be used in both onshore and offshore oilfield for oil gas well drilling fluids circulation-Drilling mud complete solids control.
End
Source:GN solids control
Email:***@hotmail.com Email Verified
Zip:063000
Tags:Zj70, Zj20, Drilling Rig, Solids Control, Mud Circulation, Fluids Processing, Shale Shaker, Mud Cleaner, Agitator, Mud
Industry:Solids control system
Location:Hebei - China
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
GN Mud System News
Trending
Most Viewed
Daily News



Like PRLog?
9K2K1K
Click to Share