Follow on Google News News By Tag Industry News News By Place Country(s) Industry News
Follow on Google News | Tips on Avoiding Emergency Power Off Disconnects in a Data CenterThe EPO button shuts off power to the data center in the event of an emergency. Making sure the EPO button isn’t used in non-emergency situations can help a data center avoid an unwanted shutdown.
By: PDU Cables In NEC terms, you have experienced a disconnect. That button, better known as an Emergency Power Off (EPO), offers several important functions. · Protect fire and emergency personnel from electrocution when fighting fires. · De-energize all electrical equipment during a fire. · Turn off all ventilation, cooling equipment and close fire dampers to contain a fire and ensure proper concentration of clean fire suppressant systems. · Shut down a data centers equipment during a flood or a sprinkler system discharge. Unfortunately with a disconnect studies suggest that your company will experienced nearly $300,000 in financial costs. (Based on averages for accidental/human error outages). Emergency Power Off - a common problem A while back I was reading a study sponsored by Emerson Network Power and conducted by the Ponemon Institute on Data Center Outages and I found the results quite surprising, especially the statistics on Accidental EPO/Human Error. The study, surveyed 453 individuals in U.S. organizations who have responsibility for data center operations, found that 95% of the respondents reported an unplanned outage during the prior 24 month period. Of those experiencing unplanned outages, 51% reported at least one outage the result of Accidental EPO/Human Error. Because Accidental EPO/Human Error often represents preventable events, data centers should establish rules and procedures to deal with EPO’s before they happen. Preventing Emergency Power Off outages Label the EPO button One of the best things you can do is clearly label what the emergency power off button is, and why it shouldn’ Cover the EPO button You don’t want an EPO button that can be triggered simply by bumping into it. A hinged plastic cover over the button or recessing the EPO button into the wall will help to prevent accidental activation. Years ago I doctored up my EPO buttons so that they could not be activated until a safety pin was first pulled. That way the EPO button could not unintentionally be pushed until the pin was first intentionally pulled, my own version of a “fail safe”. Some EPO buttons can be armed with alarms that sound when the safety cover has been opened. People will think twice about the consequences of their actions with an alarm going off around them. Cameras Some businesses have cameras throughout their data centers to monitor activity. Having a camera cover the EPO button might deter a disgruntled employee. Secure Access Policies Have a sign-in policy that requires visitors and vendors to sign-in prior to entering the data center and formally escorting them within the data center will limit the potential for EPO problems. Training All individuals with access to the data center, including IT, emergency and security personnel should have a basic understanding of the facility and the purposes and use of the EPO button, including when and why it should be activated. Install an Emergency Telephone I also recommend installing a red (indicating emergency use) telephone on the wall by the EPO buttons. This emergency phone should automatically dial an area in your facility that is manned 24x7, such as a guard station or main master control room. During an emergency situation you want a person to be able to activate the switch and get in touch with someone immediately. Every second counts in a mission critical environment, the last thing you want is for a person under stress dialing the wrong number. Ken Koty, Sales Engineer, PDU Cables http://www.pducables.com/ About PDU Cables PDU Cables manufactures and distributes power-distribution cable assemblies used by more than 5,000 data centers in North America. Known for its industry-leading innovation, PDU Cables was the first independent cable-assembly company to introduce colored conduit, to acquire UL Listing, and to offer the Power Cable and Equipment Configurator™ for documenting connections and specifying the correct under-floor power cables. End
Account Email Address Account Phone Number Disclaimer Report Abuse Page Updated Last on: Jul 16, 2013
|
|