COVID Pandemic Not a Set Back for Tejjy Inc. – Moving Ahead with Smart Construction Techniques

 
WASHINGTON - Sept. 7, 2020 - PRLog -- The COVID-19 pandemic is forcing the construction professionals to find new ways of building homes and offices. Smart construction techniques like Building Information Modeling and pre-fabrication construction powered by digital technology could transform construction in a unique way. The integration of BIM, Prefabrication, big data and artificial intelligence can actually revolutionize building sector and facilitate in providing sustainable and affordable housing for all.

Tejjy Inc. is using BIM – a first step in digital transformation of the sector. During COVID-19 lockdown, the AEC professionals are more getting adopted to BIM, enabling construction projects to continue in a digital & virtual environment, even when project participants were inept to meet in person. The collaborative BIM allows data to be shared across the disciplines and businesses, and facilitates smarter construction.

Tejjy Inc. is Going Ahead with a Bunch of BIM Projects even in the time of Pandemic.

· Signal House, at Union Market, Washington, D.C. is an award winning project by Gensler Design Excellence Award. The 225,000 RSF structure will pay accolade to traditional industrial environs with an exclusive metal, terracotta and glass. The purpose of constructing Signal House is to serve private terraces, windowed conference centre with hi-tech fitness facilities, below-grade parking, retail, & a roof swaggering a DJ booth, karaoke room, kitchen, bar, etc.

BIM usage has revolutionized the way of planning & executing construction project. BIM facilitated in creating a model & common data environment for all AEC project stakeholders. Sukh Singh, Vice President of Tejjy Inc. stated that being a BIM Consultant, lots of challenges were overcome by systematic planning through Revit BIM model creation (https://www.tejjy.com/our-services/bim-services/revit-fam...). BIM implementation in the operational phase facilitated as a sensible step throughout the building lifecycle.

· Tall City Gun Club at Mid land, Texas is a commercial project having a wide array of structural items like Trash gate, dog lag stair, ladder, hip & valley canopy, and wall panel embeds. Tejjy Inc. completed BIM project (https://www.tejjy.com/about-us/publications/case-study/) in just about 2 weeks time by coordinating with joist suppliers as in the new millennium.

· Tall City at 104 Delancy Street, New York is a residential & commercial project that required full technical understanding of hip and valley, with requirements of stair and trash enclosures. The project is completed by BIM Engineers of Tejjy Inc. (https://www.tejjy.com/our-services/bim-engineering-services/) in 2.5 weeks in a flawless manner. The challenge was to detail shopping members with the details of a stair with mezzanine. Structural BIM Engineers of Tejjy Inc. (https://www.tejjy.com/our-services/bim-engineering-services/structural-steel-design-detailing-services/) created the detail of the structural frames, avoiding field welding with BIM.

To know more about 3D BIM Modeling Services in USA, consult Tejjy Inc. (https://www.tejjy.com/) at 202-465-4830 or info@tejjy.com.

Media Contact
Tejjy Inc.
***@tejjy.com
+1 (240) 899-7711
End
Source: » Follow
Email:***@tejjy.com
Posted By:***@tejjy.com Email Verified
Tags:Bim Modeling
Industry:Construction
Location:D.C. - Washington - United States
Subject:Projects
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
Tejjy Inc. News
Trending
Most Viewed
Daily News



Like PRLog?
9K2K1K
Click to Share