CHENNAI, India -
Feb. 8, 2025 -
PRLog -- In India, the Central Drugs Standard Control Organization (CDSCO) regulates medical devices in accordance with the Medical Device Rules 2017 India. For medical device registration India (https://morulaa.com/
medical-device-
registration-
india/) on the Sugam portal, one essential requirement is the submission of a Plant Master File (PMF). This document provides detailed information about the legal manufacturing site, covering its processes, facilities, and quality systems. Below, we explore the structure of a PMF, with Morulaa's expert tips to ensure a smooth submission process and medical device compliance with CDSCO.
What is a Plant Master File (PMF)?A PMF describes the manufacturing facility, controls, and processes. It serves as a blueprint for CDSCO to evaluate the compliance and operational efficiency of the legal manufacturing site.
Key Sections of the PMFThe Plant Master File must be prepared per Medical Device Rules, 2017. Below is a breakdown of the key sections and required details:
1. General Information - Name and address of the manufacturing site.
- Contact details for key personnel, including the regulatory affairs representative.
- Legal status of the manufacturing site (ownership, certifications).
2. Organization & Personnel - Organizational structure, including senior management responsibilities.
- Qualifications, experience, and training of personnel involved in quality & production.
3. Manufacturing Activities - Manufacturing operations performed at the site.
- Critical processes, equipment, and technologies used in production.
4. Quality Management System - Overview of the quality system, in line with ISO 13485 or equivalent.
- Key quality control, risk management, and corrective action procedures.
5. Production & Process Control - Facility layout & design, ensuring Good Manufacturing Practices (GMP) compliance.
- Process validations, SOPs, and calibration records.
6. Outsourced Manufacturing - Details of contract manufacturers & third-party vendors.
- Methods for ensuring compliance with CDSCO regulations.
7. Documentation System - Record-keeping practices for production, quality control, and complaints.
- Sample templates for batch records, incident logs, and traceability.
- Steps to Prepare a PMF for CDSCO Submission
Step 1: Leverage the Medical Device Quality Manual - The Quality Manual is the primary reference for the manufacturing site. Ensure it meets CDSCO's requirements and extract relevant details for the PMF.
Step 2: Prepare AppendicesInclude facility layout, process flow diagrams, and organogram to provide a clear overview.
Step 3: Provide Evidence for CDSCO ComplianceAttach ISO 13485 certifications and inspection reports for the site and subcontractors.
Step 4: Finalize and SubmitThoroughly review the PMF to ensure accuracy & consistency before submission.
Why Choose Morulaa as Your Regulatory Consultant?By following CDSCO's framework, manufacturers can create a PMF tailored to their operations—whether in-house, subcontracted, or software-based.
Morulaa is one of India's leading medical device regulatory consultants. We simplify the PMF preparation & CDSCO submission process to help manufacturers achieve compliance efficiently.
Contact Us (
https://morulaa.com/contact-us/) for the CDSCO Sugam Template & Expert Guidance on Medical Device Registration.