Follow on Google News News By Tag * Cost Of Ownership * Photovoltaic * Semiconductor * Product Cost * Cycle Time * Coo * Oee * Simulation * Modeling * More Tags... Industry News News By Location Country(s) Industry News
Follow on Google News | “Applied Cost Modeling” E-Zine Now on WebACM has been the mainstay for manufacturing and assembly industries in disseminating information on hot topics such as cost of ownership (COO), overall equipment efficiency (OEE), cost and resource evaluation, and discrete-event simulation.
The latest edition includes the feature article: “Mask Defect Inspection Strategies: Cost of Ownership Impacts on 193nm Litho Clusters” and is presented as the first installment in a series. The article looks at both image qualification as well as direct mask inspection. “Accelerating the Movement to Grid Parity in Photovoltaic Manufacturing” For those interested in reading the remaining chapters from “Hi-Tech Equipment Reliability: http://www.amazon.com/ Additionally, WWK’s 2011 survey on equipment and process timing in the semiconductor industry will be closing at the end of March. The survey results will be consolidated and provided to all participants free of charge. Participation in the survey is the only way to receive a full set of results. The survey form can be downloaded from the WWK web site at: http://www.wwk.com/ With more than 3,000 users worldwide, Wright Williams & Kelly, Inc. is the largest privately held operational cost management software and consulting company serving technology-dependent and technology-driven organizations. WWK maintains long-term relationships with prominent industry resources including SEMATECH, SELETE, Semiconductor Equipment and Materials International (SEMI), and national labs and universities. Its client base includes nearly all of the top 20 semiconductor manufacturers and equipment and materials suppliers as well as leaders in nanotechnology, micro-electro- WWK’s product line includes TWO COOL® for detailed process step level COO and OEE, PRO COOL® for process flow and test cell costing, Factory Commander® for full factory capacity analysis and activity based costing, and Factory Explorer® for cycle time reduction and WIP planning. # # # WWK provides software and consulting services to assist our clients in making better business decisions. The focus of our efforts is to assist our clients in improving the productivity of their manufacturing operations and reducing their per-unit costs. End
|
|