Perfection Architectural Systems, Inc. Contracts with Moss & Associates for Port Everglades Project

Perfection Architectural Systems joins with Moss and Associates to provide aluminum walkways covers for Terminals 2, 19, and 26 as part of the Port Everglades renovation project.
 
May 22, 2012 - PRLog -- Fort Lauderdale, FL - Perfection Architectural Systems ( http://www.perfectionarch.com/ ), a leader in engineered canopy solutions, is pleased to announce that it has contracted with Moss and Associates of Fort Lauderdale to provide the aluminum walkway covers for three of the cruise terminals at Port Everglades as part of the port’s renovation project. Moss and Associates is the construction manager of the project.

Port Everglades, the second busiest cruise port in the world, has begun a $54 million renovation project to transform its existing cruise terminals into modern passenger facilities for more than twelve cruise lines. Perfection Architectural Systems, Inc. will be manufacturing and installing the aluminum walkway covers for Terminals 2, 19, and 26 for the project.

Terminal 2 will feature a simple passenger waiting-zone canopy, while terminals 19 and 26 will have unique walkway covers that match the style of the building. Terminal 19 will feature standard walkway covers in the parking area, as well as a large T-shaped double cantilever walkway cover that will provide shelter to passengers who are dropped off at the terminal building. Terminal 26 will have a large cantilevered canopy for bus unloading, suspended canopies, and standard walkway covers.

“We are excited to work with Moss and Associates on the terminal renovations for Port Everglades,” says Rob Jones, Business Development Manager for Perfection Architectural Systems. “This project will help make it possible for cruise lines to accommodate the 3.6 million passengers that are expected to utilize the cruise port this year.”

In addition to walkway covers, the terminals will also have two passenger loading bridges, separate baggage halls, improved ground transportation, and unique Florida-inspired artwork. The Port Everglades renovation project has a tight timeline for completion due to the cruise ship season starting in November. Terminal completion dates range from December 2012 to early June 2013.

About Perfection Architectural Systems, Inc.

Perfection Architectural Systems is a privately held manufacturing company with headquarters in Orlando, Florida. Founded in 1993, Perfection's dedicated employees have work diligently to continue the tradition of excellent workmanship and personalized service. In September 2002, they upgraded their manufacturing plant to a state of the art 61,000 square foot facility to better serve their growing customer base. The same year they added sun control devices to complement their aluminum walkway cover division. In 1995, they recognized an increasing need for local service across the nation and added their first Certified Dealer Representative in Charlotte, North Carolina. Today, they have over 12 Certified Dealer Representatives covering 22 states and now serve all of the Southeastern United States, The Eastern Seaboard, The Gulf Coast, and several states in the Midwest.
End
Source: » Follow
Email:***@perfectionarch.com Email Verified
Tags:Architecture, Port Everglades, Aluminum Canopy Systems
Industry:Architecture
Location:United States
Subject:Projects
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse



Like PRLog?
9K2K1K
Click to Share