Follow on Google News News By Tag Industry News * mud system * More Industries... News By Location Country(s) Industry News
Follow on Google News | GN 7000 Gallon Mud Recycling System for saleGN Solids Control is a top Solids Control Equipments manufacturer.We specialize in designing and manufacturing mud reycling system for oil/gas drilling, HDD,CBM Drilling, water well drilling.
By: GN Solids Control Co.,Ltd Specifications: (1) Output: Up to 520 USgpm (1970 litres/min) dependent upon solids content. (2) Cut Point: Designed to achieve a cut point of 16 microns (3) Dimensions: 9500L x 2500W x 2800H (4) Capacity: Total storage capacity 7000 US gallons (26500 litres) (5) Pumps: Three 4" x 3" centrifugal pumps with 22kW electric motors (6) Power: Integral control panel for all electrical functions. Generator required, approx 140kVA http://www.gnsolidscontrol.com/ Main Benefits: (1) Cost effective method of re-cycling drilling muds,Reduces cost of supplying fresh mud. (2) Cut point of 16 micron removes particles which damage triplex pumps, whilst leaving the useful bentonite particles in suspension for re-use. (3) High speed continuous mixing equipents incorporated. (4) Compact Design and user friendly Detailed Working Process features: Pre-screening of the returned mud using a GNZS703 Linear Motion Shale Shaker. This can handle a flow rate of up to 528 USgpm and is designed to remove particles down to 178 microns.Wedged type shaker screen make shaker screen replace easy and fast. Secondary cleaning of the returned mud using a GNZJ703-8N Mud Cleaner. The mud is pumped through 8 X 4inch desilter cones of GNZJ703-8N Mud Cleaner where the larger particles are separated out by centrifugal force. The system is capable of a throughput of up to 520 USgpm and is designed to remove particles down to 16 microns. The underflow from desilter cones are passed over a GNZJ703 linear motion shaker with a finer screen, which produces a virtually dry cuttings. Integral mixing system using Jet Mud Mixer. The jet mud mixer allows fresh mud to be prepared very rapidly from bentonite powder. One of the three pumps is used for this function allowing continuous mixing or recirculation as required. Large capacity storage facility. A total of 7000 US gallons is provided, clean tank capacity of 4000 US gallons, dirty tank capacity of 2000 US gallons and mix tank capacity of 1000 US gallons. This provides the optimum balance for operation with most drilling operations. Integral charge pump to supply clean mud back to the drilling rig. This provides a continuous supply of clean mud under pressure to the high pressure mud pump, avoiding problems of starvation and cavitation which can rapidly cause damage. http://www.gnsolidscontrol.com/ End
|
|