Follow on Google News News By Tag Industry News News By Place Country(s) Industry News
Follow on Google News | The Hospital undergoing surgeryClimaveneta units installed at the new Gustavo Frickle Hospital in Chile
By: Climaveneta Providing patients and medical personnel with ideal temperature and humidity conditions as well as huge amount of sanitary hot water, achieving these with reduced acoustic emissions and highest efficiency, are the key challenges for the HVAC system of the hospital. To hit this target the Hospital will be equipped with 8 FOCS-N, air source heat pumps with semi hermetic screw compressors, and 1 ERACS2-Q INTEGRA air source unit for simultaneous production of hot and cold water, thus satisfying precisely the air conditioning needs of the structure all year long. In particular ERACS2-Q multi-purpose heat pump has been chosen in low noise version, in order to reduce noise emissions and ensure occupiers' comfort. In addition, depending on climate conditions, best operation mode is set completely automatically and independently in order to minimize the absorbed energy in every situation. Media Relations Sara Di Clemente sara.diclemente@ http://www.climaveneta.com End
|
|