Follow on Google News News By Tag Industry News News By Location Country(s) Industry News
Follow on Google News | Trenchless directional crossing ,CBM drilling ,Small Shield Tunneling ,water well HDD mud recyclingTrenchless directional crossing , CBM drilling , Small Shield Tunneling Project , water well, geothermal well , Mining Drilling Engineering
By: Lisa Ma Type RuiLin Mud Recycling System Function Mud purification and recycling, mud mixing, mud storage Model RL200B RL400B RL600B RL800B Treating Capacity 45m³/h 90m³/h 136m³/h 180m³/h Processing Accuracy 20 microns 20 microns 20 microns 20 microns Total Power 24.4KW 44.8KW 70KW 147KW System Volume 5m³ 8.5m³ 15m³ 19.5m³ The above parameters are for reference only! Drilling mud for trenchless engineering, the mud pumped from the working machine (or sedimentation tank) (1) by the mud pump passes through the mud logging tank (2) of the shale shaker and enters the bottom layer of the shale shaker (3) of the mud recovery system. The coarse particles in the sludge are screened out, and then enter the slurry storage tank (4), and are sucked from the tank by the sand pump (5), and the slurry with a certain kinetic energy is removed from the desander (6) along the pipeline. The slurry inlet is tangentially injected, and the silt with fine particle size is discharged from the drip nozzle at the lower end by the cyclone and falls onto the upper fine screen of the shale shaker (3). After being dewatered and screened by the fine sieve, the drier fine slag is separated, and the mud passing through the fine sieve is returned to the slurry tank (4). The clean slurry processed by the cyclone (6) enters the middle storage tank (7) from the overflow pipe of the cyclone, and then is transported out along the slurry outlet pipe or returns to the slurry storage tank . IF you interested in it ,please contact Lisa Email:ogem3@ Whatsapp:8615733797085 www.rlsykj.net End
Account Email Address Account Phone Number Disclaimer Report Abuse
|
|