Follow on Google News News By Tag Industry News News By Place Country(s) Industry News
Follow on Google News | EPIC Pipeline Launches FERC Open Season for 700-Mile NGL Pipeline from NM to CC TXBy: EPIC Y Grade Pipeline, LP The pipeline starts in New Mexico near Carlsbad and will have throughput capacity of at least 350,000 barrels per day with multiple origin points in the Delaware and Midland Basins. Destinations will include the 100,000 barrels per day fractionator to be built by an affiliate of EPIC Y Grade Pipeline, LP near Corpus Christi with additional fractionators added as volumes require. In addition to the fractionator, EPIC intends to build a purity pipeline system downstream of the fractionator, including an ethane system which in the first phase will span the upper Gulf Coast into the Markham area. EPIC'S NGL Pipeline will run side-by-side for most of the route with the crude pipeline previously announced by EPIC Crude Oil Pipeline, LP. This open season will begin Monday, February 19th at 8am and will end at 5pm on Friday March 2nd. Any interested party should direct inquiries via email to: Dustin Snook, Marketing Director Dustin.Snook@ (210) 538-6874 End
Account Email Address Account Phone Number Disclaimer Report Abuse Page Updated Last on: Feb 16, 2018
|
|