WASHINGTON -
July 10, 2022 -
PRLog -- Tejjy Inc. – one of the top BIM service providers in USA has successfully delivered Building Information Modeling (BIM) services for one of the educational projects. Located in Nashville TN and spread over a project area of 3, 00,000 sq. ft. the Hillwood High School is a replacement facility, designed for a 274-acre site in Bellevue at the former Hope Park Church.
The project consists of a wide array of buildings covering 278.71 m2 including:
- Admin building
- Business hospitality
- Health Science
- Special Education
- Egress
- Restroom
- Library
- Gym
- Cafeteria
- Theatre
- Music
- Mechanical
The purpose of construction is the replacement of the Hillwood High School facility which is expected to serve a 1,600 student body in five Career Academies. The building includes modern learning environments that are flexible and rich in technology.
Regarding the Scope of Work,
Sukh Singh, Vice President of Tejjy BIM Consultants stated:
"Our BIM engineers delivered MEPF 3D modeling services at LOD 400 in Revit for plumbing and HVAC services, following standard specifications, building code compliance and streamlined workflow with
clash detection & clash resolution (
https://www.tejjy.com/our-services/mep-services/mep-clash...) amongst pipe equipment, structural and electrical work. We provided MEP Design, MEP Modeling and MEP Coordination for the educational project."
BIM Implementation Improved Project Productivity by: - Fostering communication and coordination
- Identifying errors at pre-construction
- Reducing cost & rework
- Improving construction quality
- Producing better outcome
Benefits Obtained from BIM in the Design and Construction Process: - Cost and resource savings
- Greater efficiency & shorter project lifecycles
- Improved communication & coordination
- Opportunities for prefabrication & modularization
- Higher quality results
Stakeholders Involved in the Construction Project: - Messer
- EMC Structural Engineers, P.C.
- I.C. Thomasson Associates, Inc. (ICT) – Consulting Engineers
- Civil Site Design Group – Engineers, Planners, Landscape Architects
Project Value Addition through BIM Modeling: - MEP modeling, analyzing designs & comparing at an early design development stage.
- Enabled accurate clash detection & clash coordination at the pre-construction stage.
- Enhanced productivity, saving time & cost of the project.
- Facilitated construction professionals in visualizing what is to be built in a simulated environment
- Identified potential design, construction & operational issues.
- Building Information Modeling enabled Tejjy to integrate the role of all project stakeholders, improving quality and easier project lifecycle management.
About the Company:Tejjy Inc. is an architectural, engineering, permit expediting (
https://www.tejjy.com/our-services/permit-expediter/), construction management & BIM service provider in USA serving MD, DC, VA & Baltimore areas Key services include 3D modeling, laser scanning, MEP BIM Services (https://www.tejjy.com/
our-services/
mep-services/)
, BIM consulting, architectural services, facility management (https://www.tejjy.com/
our-services/
facilities-operations-
management/), virtual design & construction. Contact the BIM consultants at 202-465-4830 or info@tejjy.com.