Follow on Google News News By Tag Industry News News By Location Country(s) Industry News
Follow on Google News | Ten acceptance steps for scaffolding in industrial projectsBy: World Scaffolding Co., Ltd. 1) The construction of the scaffolding foundation and base must be calculated according to the scaffolding height and soil conditions of the site by relevant regulations; 2) Whether the scaffolding foundation and base are compacted: 3) Whether the scaffolding foundation and base are flat; 4) Whether there is water accumulation in the scaffolding foundation and base (II) Acceptance of drainage ditch of scaffolding frame 1) Remove debris from the scaffolding site, level it, and make the drainage smooth; 2) The drainage ditch should be set between 500mm and 680mm outside the outermost row of poles of the scaffolding; 3) The width of the drainage ditch is between 200mm and 350mm; the depth is between 150mm and 300mm; a water collection well (600mmx600mmx1200mm) 4) The upper width of the drainage ditch is 300mm; the lower width is 300mm. :180mm; 5) The slope of the drainage ditch is i=0.5 (III) Acceptance of scaffolding pads and bottom brackets 1) The acceptance of scaffolding pads and bottom brackets is determined according to the height and load of the scaffolding; 2) The pad specifications of scaffolding below 24m are (width greater than 200mm, thickness greater than 50mm), ensuring that each vertical pole must be placed in the middle of the pad, and the pad area must not be less than 0.15㎡; 3) The thickness of the bottom pad of the load-bearing scaffolding above 24m must be strictly calculated; 4) The scaffolding bottom bracket must be placed in the center of the pad; the width of the scaffolding bottom bracket must be greater than 100mm and the thickness must not be less than 50mm. (IV) Acceptance of scaffolding sweeping rods 1) Sweeping rods must be connected to the vertical poles, and sweeping rods must not be connected: 2) The horizontal height difference of the sweeping rods shall not be greater than 1m, and the distance from the slope shall not be less than 0.5m; 3) The longitudinal sweeping rods shall be fixed to the vertical poles at a distance of no more than 200mm from the base epidermis with right-angle fasteners; 4) The transverse sweeping rods should be fixed to the vertical poles close to the bottom of the longitudinal sweeping rods with right-angle fasteners. https://www.hunanworld.com/ https://www.world- End
|