Follow on Google News | Full analysis of scaffolding calculationNewcomers to engineering cost, come and learn how to calculate scaffolding! First, the calculation method of scaffolding Erection size
By: World Scaffolding Co., Ltd. Erection size: the vertical distance of the vertical pole is 1.20 meters, the horizontal distance is 1.05 meters, and the step distance is 1.20 meters. Steel pipe type: 48×3.5 steel pipe is used. Wall connection: 2 steps and 2 spans are used, the vertical spacing is 2.4 meters, and the horizontal spacing is 2.4 meters. Construction load: The uniformly distributed load is 3kN/m², 2 layers are constructed, and 4 layers of scaffolding boards are laid. Cantilever horizontal steel beam: [16b channel steel is used, the length of the outer cantilever section is 1.5 meters, and the length of the anchor section is 2.5 meters. Support rod and tie rod: The outermost support point is 2 meters away from the building. The support rod uses a 100.0×10.0mm steel pipe, and the tie rod also uses a 100.0×10.0mm steel pipe. Second, the calculation of the large crossbar Calculation method: Calculate the strength and deflection according to the three-span continuous beam. Load calculation: Static load calculation value: q1=1.2×0.038+ Maximum deflection: V=(0.677×0.091+ Third, the calculation of a small crossbar Calculation method: strength and deflection calculation according to simply supported beam. Load calculation: Maximum bending moment: M=(1.2×0.038)× Maximum deflection: V=V1+V2=2.264mm, less than 1050/150 and 10mm, meeting the requirements. https://www.hunanworld.com/ https://www.world- End
|
|