Commonly used industrial scaffolding erection specifications and acceptance standards

The load of the scaffolding shall not exceed 270kg/m2. It can only be used after acceptance and approval. It should be inspected and maintained frequently during use.
By: World Scaffolding Co., Ltd.
 
CHANGSHA, China - Dec. 13, 2024 - PRLog -- 1. The load of the scaffolding shall not exceed 270kg/m2. It can only be used after acceptance and approval. It should be inspected and maintained frequently during use. Scaffolding with a load exceeding 270kg/m2 or special forms should be designed.

2. The scaffolding must be equipped with longitudinal and transverse sweeping rods. The longitudinal sweeping rod should be fixed to the vertical rod at a distance of no more than 200mm from the top of the base with a right-angle fastener. The transverse sweeping rod should also be fixed to the vertical rod just below the longitudinal sweeping rod with a right-angle fastener. When the production pole foundation is not at the same height, the longitudinal sweeping rod at the high position must be extended to the low position by two spans and fixed to the vertical rod, and the height difference should not be greater than 1m. The distance from the vertical rod axis above the slope to the slope should not be less than 500mm.

3. The steel pipe column should be equipped with a steel base. For soft geological foundations, wooden boards should be padded, or sweeping rods should be installed. The sweeping rod should not be more than 200mm from the ground.

4. The scaffolding poles should be vertical, the vertical deflection should not exceed 1/200 of the height, and the distance between the poles should not exceed 2 meters.

5. The scaffolding poles should be vertical, the vertical deflection should not exceed 1/200 of the height, and the distance between the poles should not exceed 2 meters.

6. The scaffolding poles should be vertical, the vertical deflection should not exceed 1/200 of the height, and the distance between the poles should not exceed 2 meters.

7. The crossbars of the scaffolding should be raised and reinforced at the passages and escalators, and should not block the passages.

8. The crossbar step of the cantilever scaffolding is generally 1.2 meters, and diagonal braces should be added. The angle between the diagonal braces and the vertical plane should not exceed 30°.

9. To prevent the frame tube from bending under pressure and the fasteners from sliding off the tube head, the intersecting ends of each rod should be greater than 10 cm.
https://www.hunanworld.com/
https://www.world-scaffold.com/
End
Source:World Scaffolding Co., Ltd.
Email:***@hunanworld.com
Tags:Scaffold
Industry:Consumer
Location:Changsha - Hunan - China
Account Email Address Verified     Account Phone Number Verified     Disclaimer     Report Abuse
hunanworld PRs
Trending News
Most Viewed
Top Daily News



Like PRLog?
9K2K1K
Click to Share